Hazardous flammable gases with dust particle in Division 1 and Division 2 of gases
Heavy Mine machine like TBM ( Tunnel Boring Machine length of 200m)
Excavating machinery
LPDT trucks movement
Multiple tunnel in short length creating non line of singh for communications as well as risk of accidents
Heat, Dampness and muddy terrain
Landslide
Collapse of the ongoing or adjacent mine of due to creation of vertical stopes where veins of precious metals are extracted.
Shortage of oxygen below ground
UPS Power used without ground
Required Equipment’s and Solutions
Pressure Transmitters and PLC & SCADA System :
Vega Pressure Transmitter are installed for
measuring & monitoring the real time pressure in pressure line carrying paste for filling the
voids ceated due to mining .Allan Bradley PLCs & SCADA System are installed for monitoring,
recording & controlling of above systems and its communication with existing main plant
SCADA/DCS.
This scada system helps the operator to check and control the pressure in the pipeline at all
the location of mine and in turn timely spray of the paste at the required locations .